Yesterday i.e., 30th September was the last date for the submission of Synopsis and the Seminar topic to your respective supervisor. If there was any change in the topic and/ or change in the name of the supervisor, the same was also to be updated by yesterday.

The synopsis submitted shall be evaluated by your supervisor and the same shall also be communicated to you in due course of time.

I hope you all are also maintaining a DIARY for your daily work which you are getting signed by your supervisor on a daily basis. 

Every week you also have to present your work to your supervisor in the form of a 3-4 slide presentation. 

All these shall be used for the continuous assessment of the project work, which has a weightage of 60%.

Thursday, September 29, 2016

roll numbers

M. Tech-CE (Structural Engg.); I Sem.; 2016-17
S. No. System ID Roll No. Name of Student
1 2016015093 160136001 Afshana Farooq
2 2016015166 160136002 Asif Abdullah
3 2016011906 160136003 Atinjay Kumar Singh
4 2016009603 160136004 Devesh Kumar Pandey
5 2016003173 160136005 Faishal Khan
6 2016016018 160136006 Faiza Manzoor
7 2016012261 160136007 Jeevan Acharya
8 2016011392 160136008 Kamal Kishor Mukhiya
9 2016016038 160136009 Kh Yasir Mehdi
10 2016012813 160136010 Lalhruaipuia .
11 2016009989 160136011 Md. Hafizur Rahman
12 2016003607 160136012 Mohd Umair Aziz Ansari
13 2016014645 160136013 Mohmad Yaseen
14 2016013626 160136014 Moiyeen Ul Majid
15 2016013489 160136015 Nitish Bharadwaj
16 2016012084 160136016 Sanjeev Kumar
17 2016006835 160136017 Sheikh Sameer Ahmad
18 2016006064 160136018 Shivam Bharadwaj
19 2016012087 160136019 Shivam kumar Yadav
20 2016002009 160136020 Syed Adnan Fayaz Andrabi

Wednesday, September 21, 2016

SUBMISSION OF SEMINAR TOPICS AND METHODOLOGY OF PROJECT

Dear Students,

You are advised to submit your seminar topic and methodology of the project by 30th September 2016 to respected HOD sir. Your methodology should be duly signed by you and your guide and then submitted. Contact your respective guides for any queries. Also you have to give a presentation of the progress of your project work to your respective guides (notice already there on blog).

MTech Dissertation/ Project Status and guidelines

You can access your project status from the below link,

MTech Dissertation/ Project Status

It has been updated based upon the feedback of your supervisor.

The guidelines to be followed is being shared with you and they are,

Procedure for confirming the thesis topic

The thesis topic/and research works to be accomplished shall be based on the common understanding between the supervisor and the student. The supervisor shall prepare a 1-2 page long working document outlining the following:

a) A thesis title

b) A very short introduction to outstanding research problems associated with the topic.

c) A concise description of the research works to be performed part of the thesis works. This will normally include planned method(s) to be adopted for the work.

d) Time line- indicating the different stages of work-progress tracking by the supervisor, and the internal examinations and the external examinations from the department.

The document shall be signed by the supervisor and the student and submitted to Head of the Department and Course Coordinator. The working document will serve as a guideline for the student for the entire thesis period.

Work Progress Tracking

Following steps are to be followed by the student and the supervisor:

i) The student will maintain a work diary, which shall be signed by the supervisor at regular intervals (weekly or fortnightly).

ii) The student will meet the supervisor every week.

iii) In each meeting, the supervisor will record the details of the meeting in the work diary of the student. The supervisors note must contain the following in his/her handwriting:

a) The date of the meeting.
b) The topics discussed in the meeting.
c) The anticipated work from the student before the next meeting.
d) The date of the next meeting.
e) The supervisor’s signature.

iv) On every meeting with the supervisor, the student has to show their progress of the project in the form of a small presentation (3-4 slides) so that efficient tracking of the progress can be done.

v) In case the student is out-stationed, it will be his responsibility to ensure that the details mentioned in points ii) and iii) are met. Further, the student must appraise the head supervisor at a regular interval (at least fortnightly) at the university about the progress made on the thesis tasks. Such communication can be through emails and if required through video-conferencing and emails.

vi) The evaluation of the work should be done by a committee twice during a semester. Before submission of thesis, a pre-submission viva/seminar will be conducted.

vii) Each student will present his/her work before a committee comprising of HOD, Course-Coordinator and Supervisor. The final grade of the student will be based on the agreement of the committee with input from external and internal examiners.

Modification of Project Tasks

Any significant changes required in the working document (e.g. change of methods, time line, or title) shall be only possible upon a common application by the student duly signed by the supervisor and submitted to Head of the Department and Course Coordinator.

Journal access in the library

All the journals which have been subscribed by the University are accessible to all the students "IN CAMPUS". They are not accessible from outside the campus. The library has provision for 5 students to access the journals simultaneously. In few days, the the number of access points shall be increased.

Monday, September 19, 2016

PROJECT PROGRESS PRESENTATION

Dear Students,

You all are advised to give a presentation on the progress of your project work to your respective guides. This exercise needs to be completed by 28th September 2016. You can contact your respective guides for schedule of the presentation. Marks will be deducted of students who fail to give the presentation in the stipulated time.


Sunday, September 18, 2016

ORIENTATION SESSION

An orientation session of M.Tech (Structures and Geo-Tech) students is scheduled on Wednesday, 21st September 2016 at 9.45 AM in Room 204 Block 3. Please make it convenient to attend.

Monday, September 12, 2016

It has been almost 2weeks that the project has been allotted to you. A report has been asked from your respective supervisors regarding the status of your project part-1. 

If you have not yet reported to your supervisor or have not yet submitted the methodology, do it ASAP as there is marks deductions at each stage.