Monday, March 27, 2017

Design of concrete Structure

In coming tut test will be from shear reinforcement. As already announced in the class test will two type of question practiced in class. 

Thursday, March 9, 2017

Urgent : Resumes Required for Campus hiring



Dear Students
AECOM will visit our campus soon.intrested students kindly send your resumes by tomorrow 10th march'17 to email Id given below :
shikha.saini@sharda.ac.in

About the Company: AECOM (formerly known as AECOM Technology Corporationis an American Multinational engineering firm that provides design, consulting, construction, and management services to a wide range of clients.
AECOM has approximately 95,000 employees,[4] and is number 156 on the 2016 Fortune 500 list.[Fortune named AECOM as 2015,2016 and 2017 World's Most Admired Companies, and Engineering News-Record ranked AECOM as Number 1 Global Design Firm.Headquarters: Los Angeles, California.
Founded: 1990
Revenue: $ 19 Billion.



Posted By:

Shikha Saini

Faizanul Haque

Tuesday, February 14, 2017

Contrivance 2k17

Contrivance 2k17 is an amalgmation of more than 27 events and having a cash prize of more than 2.5 lakhs.

Contrivance 2k17 is going to be held on 23-24 Feb.

Registration process is on.Registration desks are located on various places in the campus.

Setu Nirman, the event from civil engineering depatment is already getting too many registrations and most of the participants are from other university.

Register now and make Contrivance 2k17 (North India's Largest Technical Fest) a grand success

Helpline no 9650341383

Like us on fb/contrivance
Follow us on instagram/Contrivancefest
Follow us on snapchat/Contrivancefest

Thursday, January 19, 2017

Attendance and CA: RULES

We have been given a go-ahead by the management to enforce the attendance and CA criteria mercilessly to increase the participation of the students in the class and lab. Below are few advises for you all so that you do not suffer at the end of the term.

Attendance:

Attendance of 75% shall "strictly" be followed. The only allowed relaxation shall be medical/ sports/ cultural/ placement (any one, not all) and the relaxation shall not exceed a maximum of 10%.

Attendance is being marked in vAttendance on a daily basis and is also accessible for you to see. There shall be no manual intervention in the attendance compilation and the attendance at any stage shall ONLY be counted from vAttendnace. It shall be your responsibility to check your daily attendance and if there is any discrepancy, inform the concerned faculty, so that the same can be corrected immediately. Late reporting shall not be considered. It can only be considered on the day of the attendance only.

If you have not yet started using Vattendance, you are advised to start using it NOW.

CA in theory, Lab and Term paper: 
CA shall be monitored on a regular basis through tests, quizzes, presentations, assignments etc, as the case be. Your overall CA shall be on the basis of these, which might have been briefed to you by the concerned faculty. If they have not, ask them the criteria for  CA. This applies to both the theory and lab courses.

Regarding the Term paper, a specific period has been designated. The attendance of the period shall also be counted and the tasks performed in the class shall be used for the calculation of 40% of the CA of term paper (25 marks out of 60).

CA in projects: 
Regarding the project (final year, both UG and PG), every group/ student has to report to the guide, once a week. Attendance at the guide end shall also be maintained. 10% of the CA for project shall be based upon the attendance.

The students shall also maintain an individual (not a group) diary where they shall keep a track of the work they are doing. The diary shall also form a part of the evaluation scheme. The diary needs to be signed by the guide every week. Every week the group/ student has to give a presentation of ONLY FOUR slides about the progress of the work. All these shall have some components towards the final CA for the project.

So if you are not attending classes, lab, term paper periods or project session, do it at YOUR OWN RISK.

Thesis: Important Notice

It is the responsibility of all the students to report to their respective thesis advisors regularly and show significant work towards their thesis. The weekly meetings and performance reports will be used to assess your progress and performance for this course.

It is expected that everyone is devoting significant amount of time towards their thesis and that it will reflect 1-year's worth of quality work. The laboratories have been made available on every Saturday (apart from the regular work week) to provide enough resources for research.

Non-performance will be marked accordingly and no last minute rescues should be expected.